DB300 LASER INSTALLATION
(1)Mount
the Control Center in plain view for the operator
& connect the
power cable to 12 volts.
(2)Mount
the DB1000 receiver on a pole over the blade & screw in the cables.
(3)Plumb
the hydraulics: PT HYDRAULIC INSTALLATION (PDF)